Wednesday, January 30, 2013

Week of January 30. More mudding!

Again, all interior work. Rain in January? Thunderstorms? Really? So much for changes on the ouside.....

Dining room from the living area

fireplace all covered up

stairs going up. I love the turn!

back kitchen door

kitchen with Debra in the laundry room door

Arches upon arches upon arches. looking from the kitchen through the dining to the office & foyer





Wednesday, January 23, 2013

Taping and mudding. No outside work, it's too cold!

Builder Bruce has been staying warm in his workshop, working on cabinets. The drywall was finished last week, the mudders arrived today. Probably two weeks for them, then painting, then the hardwood.

Master suite


Living room & dining room

kitchen pass-through from dining room

Kitchen   


Two more exterior shots--back of the house


Thursday, January 17, 2013

Sheetrocking almost done.....

Here are a variety of photos of the sheetrocked rooms:

living room with Dan Fam

living room

living room

foyer & office

foyer door

master suite

master suite sitting bump-out

master suite library corridor

study

living room

Monday, January 14, 2013

There will be substantial interior changes this week. The walls are all insulated and the sheetrock is starting to go up:

The fireplace is now all framed in (except for the hearth).



the doorway from the master suite to the living room/dining room

The doorway from the
Sheetrockers at work in the master suite. They started only an hour earlier....

OK, so a nightime visit to see the drywall. Maybe 2/3 of the second floor is done, all of the first floor ceiling is in:

upstairs loft room

second floor view from the balcony door

upstairs bedroom

view from the top of the stairs

Saturday, January 12, 2013

French doors installed

Another week has gone by......warm weather and an early January thaw! The french doors for the piano room have been installed. Interior is about to be sheetrocked!




Friday, January 4, 2013

Weekly view - front door installed

Again, the exterior isn't changing much from previous weeks--that's winter building in Wisconsin! The interior walls are being insulated, prep work being done for ceiling insulation, lots of small details. The 8 foot front door was hung as were the back and suite doors.

Here's the pictures: